Torcon logo
Home Projects Services Specialty Areas Careers Locations   Project Portal Login
Join Torcon
Join Torcon
Discover Torcon by Region
 
Discover Torcon by Region

Puerto Rico

New Projects

  • Expansion to a bulk staging area for the installation of a new oral solid dosage pilot plant. The expansion consists of a three-story building with non-production space in the first floor, a manufacturing suite on the second level, and a mechanical penthouse. This annex will house a high containment blending system. The scope includes installation of API holding tanks, a vacuum transfer system, and blending equipment.
  • Consolidation of API bulk chemical manufacturing sites –including the transfer of four API products from two different sites into an existing bulk chemical plant. This scope also includes the installation of new isolation capacity equipment in a building expansion to replace existing equipment with state-of-the-art process equipment. In addition, a new USP water generation, storage and distribution system will be installed to support organic synthesis manufacturing process and equipment cleaning in three production buildings.
  • Reconditioning/refurbishing of fire protection water storage tanks providing repairs to the existing tank shell and structural members, and replacement of tank top cover.
  • Parenteral manufacturing expansion adding a production cell (FISOLYO) that is self-contained by means of new isolation barrier technology. This scope includes a chiller building with three cooling towers and four chillers, a continuous power supply (CPS) or rotary wheel, and renovated space for pharmacy and gowning/degowning areas.


  Contact Torcon
  Name:
 
  Company:
 
  Phone:
 
  Email: