Technosphere Insulin Manufacturing Facility
Torcon was construction manager for MannKind Corporation’s new Technosphere Insulin manufacturing
plant. The project consisted of interior demolition and renovations to an existing two story production
building. Approximately 70,000 sq. ft. of the existing space was renovated to house new manufacturing
operations. An attached 12,000 sq. ft. central utility plant was also upgraded with new equipment and
services. Renovations occurred within the same building as MannKind’s ongoing clinical manufacturing
suite, which remained in operation throughout construction. Extensive planning and phasing were used to
keep these areas cGMP compliant.
At the same time as the renovation work was proceeding, Torcon built a 180,000 sq. ft. addition to the plant.
Two fill and packaging suites with associated support rooms were fit-out as part of this phase of work. Each
of the four suites (two finished and two shelled for future) can accommodate three fill/packaging lines. The
entire second floor of the new building was fit-out for office, meeting, dining and support operations. The
new building also includes 9500 sq. ft. of material and product storage space, most of which is refrigerated.
The project provides space for bulk manufacturing operations with solution prep, formulation, a
Cryogranulator, and two lyophilizers for freeze drying bulk product. Product is then transferred to the
packaging building for primary packaging into the cartridges for inhalation.
Utility upgrades encompassed new WFI stills, tanks and distribution loops and clean steam generation and
distribution. New HVAC systems were also installed including new electrical gear, boilers and chillers.
Torcon provided comprehensive preconstruction services including estimating, scheduling and
procurement, working closely with the designers and owner as an integrated team. Our team participated in
design reviews and made significant value engineering and constructability recommendations.
Construction was phased to complete the renovation prior to the new packaging area. This approach
permitted commissioning, validation and regulatory review to begin early.
The MannKind facility is the first project to ever receive ISPE’s Facility of the Year awards in two categories.