|
Projects
New Projects
Healthcare
Greystone Park Psychiatric
Hospital |
New 458,000 sq.ft./450 bed psychiatric hospital
for the State of New Jersey. Green field site. The facility
consists of ten interconnected buildings, including six, three-story
patient wings, a central core facility and four support buildings
with classrooms, a library, treatment /medical services areas,
administrative facilities and an auditorium. New entry driveways,
access roads, parking area and landscaping.
|
| |
Geisinger Health System
Hospital for Advanced Medicine
|
Construction of new nine-story patient pavilion
with 308,000 sq. ft. of space. Includes 60 new patient beds
on several floors; 50,000 sq. ft. of diagnostic and lab space;
and a 32,000 sq. ft. surgical suite. The new building will provide
space for imaging, non-invasive and interventional cardiology,
a Cardiology Clinic, Cardiothoracic vascular clinics and labs,
and food service. New central chilled water plant and expansion/relocation
of existing electric and hot water infrastructure.
|
|
|